Holt Egress Window
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2006/holt-egress-window/HoltMarieEgressWindow027_3.jpg)
Holt Egress Windows Completed February 2006 AfterBeforeIn Progress Previous slide Next slide See All Project Photos Project Summary Completed February 2006
Phifer Siding & Paint
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2013/phifer-siding-and-paint/PhiferSidingandPaintSidinginprogress12_11-min.jpg)
Phifer Siding & Paint Completed August 2013 AfterBeforeIn ProgressBeforeIn Progress Previous slide Next slide See All Project Photos Project Summary Completed August 2013
Cornelius Interior
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2013/cornelius-interior-project/CorneliusInteriorPaintandFloorcoveringEastbedroompainted2_8-1024x768.jpg)
Cornelius Exterior Completed August 2013 AfterAfter Before Previous slide Next slide See All Project Photos Project Summary Completed August 2013
Cornelius Exterior
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2013/cornelius-exterior-project/CorneliusExteriorPaintingPresurewashingcompleted5_1.jpg)
Cornelius Exterior Completed August 2013 During ProjectDuring Project Previous Next See All Project Photos Project Summary Completed August 2013
Pines Project
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2013/pines-project/PinesMiscRemodelingDeckcompleted1_2.jpg)
Pines Project Completed August 2013 BeforeAfterDuring FramingAfter Previous slide Next slide See All Project Photos Project Summary Completed August 2013
Citizen’s Bank Legacy Building
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2013/citizens-bank-legacy-building/CitizensBankLegacyBuildingWindowsandSidingNewwindowandsidingoneastwall1_5.jpg)
I was asked by the bank to look at this project due to a deteriorating window and siding. After looking at the building and giving the bank a proposal, it was decided that we would replace the pressed hardboard lap siding on both gables and the vertical board batt siding on the east side around the window with fiber-cement siding…
St. Mary’s Church Deck & Ramp
![St Mary's Catholic Church Deck and Ramp Completed](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2012/st-marys-catholic-church/StMarysCatholicChurchDeckandRampCompleted3_3.jpg)
This new deck and ramp will provide easy access to the entry of the church.
Tatum Bedroom Remodel
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2012/tatum-bedroom-remodel/8aTatumBedroomRemodelNewfloorframingin2_2.jpg)
In this project, we will be doing all of the demolition, concrete and framing work to turn the attached garage into a master bedroom.
Maples Rental Remodel
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2012/maples-rental-remodel/1aMaples902E8thRemodelBefore2_5.jpg)
This project consists of a combination of three separate projects that are being combined into one. The first is the remodeling of the upstairs bathroom. The second is the repair/replacement of the kitchen ceiling. The third is the removal of the walls that had been built to enclose the front porch.
Wilson Windows & Siding
![](https://www.timbercreekconstruction.us/wp-content/uploads/Projects/2012/wilson-siding-and-window/WilsonSidingandWindowsCompleted1_81-min.jpg)
In this project we will install eight new prefinished Pella Proline windows, a new Pella prefinished wood grained fiberglass front entry door, and a new Pella Proline sliding patio door.